All resources All webinars

[Engineering News-Record] Setting Up for Lean Construction: Tips and Tricks for Reducing Waste, Rework and Delay

Succeeding with Lean Construction’s systematic approach to reducing waste, rework and delay requires the implementation of a set of inter-related production management policies. Those policies are designed to foster and support real time understanding of a project’s status, realistic short and long-term forecasting, and just-in-time supply chain optimization. Tooling up with the right technology is key, but without implementing and sticking with the right policies, the hoped for results won’t be achieved.

During this on-demand webinar, you hear from construction experts who understand Lean Construction and who share their tips for setting it up and doing it right.

 

Register for webinar

Thanks for registering!

Past webinars:
26:41 min
Introducing: PlanGrid's Field Reports
34:19
Introducing PlanGrid Workspaces: Take control of how your team collaborates
23:56 min
How PlanGrid helps Jerram Falkus deliver construction projects on time